Saturday, February 7, 2015

The Build Process - Compare Job Progress to Job Plans - Part 4

Information collected from the site is reviewed and compared with the project plan to determine if the project is on time, the resources (both material and personnel) allocated were sufficient and of the right type, and the actual state of the project conforms to the schedule. Effectively comparing the project’s progress to the job plan enables you, as the customer, to bring the project manager’s attention to an area of the project most in need of attention.
Take Corrective Action
The corrective action necessary requires decisions to be made by the project manager and addresses questions that are technical in nature and relative to an actual issue that may be the cause of or result in a delay.  Your input may be required, time to time, to agree with a proposed solution to an unanticipated event.
Typically, this may be something as simple as where the tile can be stored indoors, an alternate location to keep a family pet, or setting aside an area in the yard to stage materials. Or you may find the discussion involves dealing with a cost overrun, material shortage or substitution.
Whatever the issue, your input will be required to help guide the project manager and it is necessary you, as the owner, agree to the proposed work arounds, or offer alternate solutions.  Unfortunately, you may find making these kinds of decisions bring you out of your comfort zone because you lack sufficient expertise and knowledge to know if your decision is the best one to make.
Whatever the case, deviations in the project plan must be noted.  Failure to note these issues and deal with them will result in a job that will end up behind schedule, over cost, and not conform to the contract documents.  The result of not taking corrective action is the equivalent of not monitoring the project at all.
Collect Historical Data
This involves collecting data about what has happened.  The type of information collected validates the work as the project progresses.  This requires measuring walls to validate they were built the required length, are the needed width, and placed in the correct location. Walls built in the wrong location happen more often than you may realize.  The same goes for lowered ceilings, bulkheads, and chases for mechanical elements such as ductwork and plumbing.
The drawings are your authoritative source of information indicating where the electrical, plumbing and HVAC rough-ins are to be placed, the sizes for openings for doors and windows, and show the tile installation patterns. Comparing the as-built conditions to the design requirements needs to be done as the work progresses in order to identify or pinpoint any deviations from the job plan.  Also, prior to any material being installed, the material needs to be inspected and validated to ensure they match those specified. A record of this inspection needs to be kept available along with any photographs taken.
The historical data collected serves two purposes: first, to serve as a basis for planning future jobs; and second, to serve as a thorough record of actual events in the event claims for non-performance arise.
The purpose and importance of describing the components of the Project Control Cycle was to help you understand what they are and the underlying concepts behind all the actions and steps used to properly control, monitor, report, and record the status of the project.
By understanding how the project is managed and monitored you are empowered to know if the project is doomed or can be saved. It’s not enough to understand how things are to be controlled, you also need more information describing when an activity is to take place, who will be doing what, how long it will take.  This information is contained in the Building Schedule.

The Build Process - Project Control Cycle Components - Part 3

The project control cycle applies just as readily to activities such as demolition, installation of  plumbing fixtures, floor and wall tile, and painting as it does to the suppliers who are providing the materials and products used to build your renovation. Your project’s success, and especially for a seemingly small one like a bathroom, needs to follow a Project Control Cycle  because one small deviation can have a significant impact on the progress of the work.
Here is a more detailed explanation for each of the Project Control Cycle components.

Set Initial Goals

The first task in the project cycle is to set goals for each of the activities. This step needs to be completed before the job is awarded to the contractor to do the work.  Many of the goals you are required to identify are the project pricing, materials selected, and the completion of the contract documents such as the detailed working drawings, scope of work and specifications.
The pricing allows you to arrive at an initial cost for the project. The working drawings, scope of work, and specifications identify who is going to do the work, where it’s going to be done, what materials are to be used, and how long the project will take. Simply put, the budget for the construction should not exceed the costs anticipated in the estimate nor can the time planned in a schedule exceed the number of days permitted.
Why? Under the terms of the contract, expectations for the budget and schedule are clearly disclosed.
It is important these initial goals are established and agreed to in writing before any work starts. Knowing what these goals are allows you to measure the project’s progress enabling you to address issues in a proactive rather than a reactive manner. So if your scope of work outlines a task needs to be completed in 1 day, and 3 days later the task is still not complete, the damage this delay causes to the project becomes extremely evident, especially if it’s the early stages, such as the site preparation activity.
Establish Job Plans
Establishing your project’s Job Plan is a three step process.  
First, the job is broken down into its composite parts or activities.  
The second step is to plan and optimize the activity for maximum efficiency.  For example, some of the activities may be Site Preparation, Demolition, Mechanical Rough-in, Framing, etc..
Lastly, with the activities identified, these are then strung together in a realistic order of work.  This order of work is converted into a diagram and calculations are applied to determine at what time and on what dates the activity should take place.  
The result is a plan you can use as a guide for all of those involved with building the job. The job plan is used to effectively cope with the inevitable changes that will occur.
Monitor Progress
Monitoring progress of the project is a two step process.  
The first part is carried out on the job site at regular intervals and involves monitoring the actual events occurring. This may happen once or twice a day, typically being at the beginning and half way through the day.  The purpose of this monitoring activity is to determine who is on site and/or confirm if the materials have arrived or are available for the work scheduled.
The information gathered from the monitoring activity is compared to the working drawings to confirm the work is being done to meet the design developed. The specifications are consulted to ensure the correct materials delivered are those purchased. Jobsite health and safety practices and standards are important, and the trades doing the work are observed to confirm they are meeting those standards.
The second step of the process is to monitor the schedule, or schedule monitoring as it’s called, and this is done on an activity by activity basis to measure if: the work starts on time, is performed within the time allocated, and is completed according to the schedule.  Schedule monitoring is done at all stages of construction, from set-up to the final cleaning. This includes the performance of all of the required inspections too.

The Build Process - Your Project and the Project Control Cycle - Part 2

To bring order to the seemingly chaotic world of construction, a formal method is used to control, monitor, evaluate, support decision making, and allow you to understand how well your project is progressing once it’s underway. Your contractor’s goal is to meet each of the objectives you define and outline in your construction contract and those objectives are to:
  • Establish a realistic schedule
  • Work within a realistic budget
  • Identify resources/materials used
  • Define the project’s outcome
To manage a project such as a bathroom renovation, the method used to do all of this is called the Project Management Cycle. Basically, it’s a term used to identify the project’s performance criteria, allowing you to control and monitor the progress of the job.  Using a Project Management Cycle enables your contractor to establish short term goals and you to determine if these goals are being met.  
If project goals are not being met, the Project Management Cycle will show you how successful or unsuccessful your project is so action can be taken to get everything back on track, fast, or keep on making steady progress.
To do this, the Project Control Cycle allows you understand the who, what, when and how of your project to:
  • Control material and personnel resources
  • Organize trades
  • Direct activities
  • Decide on the use of resources and individuals
  • Control and direct trades toward a goal
  • Define a formal decision making process to achieve specific goals
You need to be able to understand how this is being accomplished because your project has the following characteristics:
  • It’s fractured
  • There a large number of disconnected people involved (craftsmen, subcontractors, suppliers, designers, and you, the owner)
  • Suppliers and installers need to be coordinated
  • A small mistake or oversight can have huge implications later on in the project
  • Everyone has an opinion
  • Decisions have to take into account the requirements, opinions, and attitudes of all those involved
  • The customer is rarely right (because of their limited experience and practical knowledge)
Here, in a nutshell, are the major steps used to ensure every activity performed for your project is successful.  Each project requires your manager to:
  • Set initial goals
  • Establish job plans
  • Monitor progress on work done
  • Compare progress to job plans
  • Look for deviations in the work
  • Take corrective action
  • Collect historical data
Now let’s take a more in-depth look at what this all means to you and how you will be able to determine the effectiveness of the manager in charge of your project.

The Build Process - An Introduction - Part 1

The Build Process for your project requires you to prepare the space where the work will be done, select and then coordinate the delivery of your materials, and hire the trades necessary to do the work required.  If you’ve done all this, you are now ready for the Build Process for your project.  

When you were planning your renovation, selecting the materials, and working to prepare the construction documentation such as specifications and scope of work, it may have taken you well out of your comfort zone.  Completing all of those tasks requires a great deal of time, patience, and perseverance on your part. Now you need to ensure all that time and effort you’ve invested into your planning and design phase is actually used to build your project. To do this, a process or system is used to manage the build.
To ensure your project is a success, process management tools are used. The more you understand about the build process and how it’s managed, the more it makes sense for you to understand how your project is controlled and the activities and resources are managed. This knowledge equips you with the means to measure and evaluate the progress of the project on a day to day basis, along with the performance of the contractor you’ve hired to do the work.
A fundamental building block of the process used to manage, monitor, and control your project is the Project Control Cycle.  Every activity starts and ends with this cycle. What you need to understand is the project is made up of a number of smaller individual projects or activities and each of these smaller activities is managed by the Project Control Cycle. The success of your renovation depends on how well the Project Control Cycle is applied to these activities.
As the owner of the project, you are a stakeholder and whoever you hire someone to do the work for you, shares the responsibility with you to ensure the work is done to conform to the specifications and scope of work.
Although some of the trades such as the plumber, HVAC, and electricians may need to be certified, the person running your project does not need to be. Nor are they required to be either. So despite all the time and effort you spent with other certified and accredited building professionals and/or suppliers, to help you design and develop your project, there are no guarantees your project will be managed well, or at all.
To protect your project and the investment you are making, you need to monitor the project and measure its outcome to be sure you are receiving the services you paid for.
So how do you do that?
The Project Control Cycle is the key you use to be assured what you have created will be delivered.

Friday, November 21, 2014

Feeling Confused? Frustrated?

If you're feeling confused or frustrated about how to proceed with a renovation or any building project, you're in good company.

Without taking the time to prepare for the project you also include everyone who would like to help you too.

Forget Free Estimates, because they have an accuracy of plus or minus 120 percent.

Before contacting anyone to do anything, you need to:
  • Identify your requirements
  • Know your budget
  • Be realistic with your expectations. 
Let's face it, building a house is expensive, and renovating an older home even more so. In order to properly move your project successfully from napkin scribbles to where nails are being driven, you need to spend time preparing an accurate scope of work.
Your scope of work identifies:
  • The type of material used
  • How the material is stored, handled, and installed
  • Crew size required to do the work 
  • How you will evaluate the work performed.
Your scope of work also forms the foundation of the agreement between you and your contractors. It provides everyone with a clear and concise set of expectations enabling you to get a price for work and materials you want rather than what people think you need.

Here is a high level outline you might find helpful as a framework to use to help you prepare for a renovation or construction project:

1. Do a feasibility study to see if: your zoning allows you to do what you want, your existing services are up to snuff, and the expectations for your project are realistic.

If all is good, then:

2. Identify your budget
3. Develop a design/plan to suit

Use the budget and plan to:

5. Determine costs for upgrades to your existing systems
6. Create a scope of work and set of specifications based on the design and/or plan
7. Solicit and pay for a detailed cost analysis based on the scope of work, specifications, and plan
8. Assess and adjust the budget and/or design and/or project scope of work to give you what you need
9. Go back to step 1 and repeat as often as required.

Only when your budget, pricing and plans all align do you go to the next step:

10. Tender your project for bids

Thursday, May 29, 2014

Cost Versus Value - A Delicate Balance

As a homeowner you're probably curious what projects provide you with the best return on your investment (ROI). Or maybe you want to spruce up your home to help with its resale.

As an architectural professional, questions I'm often asked are: What are my options? Is this project worth the time? Is it worth the money?

Fortunately, there's information out there to help you understand what the costs and ROI will be for typical renovation projects.  It's often surprising to learn bigger is not often better.

Let's take a look at a kitchen renovation as an example.

A major kitchen remodel may cost you anywhere between $40K to $60K. A minor kitchen remodel will be in the price range of $10K to $20K, maximum. If you, the homeowner, are thinking the major kitchen remodel is going to give you a 100% ROI you're sorely mistaken. Same goes for the smaller kitchen remodel.

The ROI for the major kitchen remodel tops out at 74.2% and the ROI for the smaller kitchen makeover is 82.7%.  So if you're looking to add value to your home for resale, fixing up the kitchen may not be the best project to undertake.

Here's what I mean.

Let's say you're thinking of selling your home in the next year or two and your home renovation budget is $15K. Your goal is to make your home sell faster, since the time it spends on the market just eats into your profit margin.  Your second criteria is you want as high a ROI as possible.

What projects should you consider? 

For a budget of $15K, here are a couple of scenarios you may want to consider to help improve your home's curb appeal, saleability, and the ROI you will experience.


Scenario 1
  • Entry Door Replacement (steel) 
    • Your cost: $1,162 
    • Your return: $1,122 
    • Your ROI: 96.6% 
  • Wooden Deck Addition
    • Your cost: $9,539
    • Your return: $8,334
    • Your ROI: 87.4%
  • Garage Door Replacement
    • Your cost: $1,534
    • Your return: $1,283
    • Your ROI: 83.7%
This first scenario will cost you $12,235 and your ROI will be $10,739.  The difference is a loss of $1,496.

Scenario 2

If you want to switch things up a bit, consider what this scenario offers:

  • Entry Door Replacement (steel) 
    • Your cost: $1,162 
    • Your return: $1,122 
    • Your ROI: 96.6% 
  • Window Replacement (vinyl)
    • Your cost: $9,978
    • Your return: $7,857
    • Your ROI: 78.7%
  • Garage Door Replacement
    • Your cost: $1,534
    • Your return: $1,283
    • Your ROI: 83.7%
This second scenario will cost you $12,674 and your ROI will be $10,262.  The difference is a loss of $2,412.

Both home improvement scenarios are below the $15K margin, which is a good thing, because you give yourself some wiggle room for any unforeseen complications with the work.

Scenario 3

Let's compare these two scenarios to a bathroom remodel:
  •  Bathroom Remodel
    • Your cost: $16,128
    • Your return: $11,688
    • Your ROI: 72.5%
The bathroom remodel will cost you $16,128 and your ROI will be $11,688.  The difference is a loss of $4,440.

When we compare the bathroom remodel to Scenario 1 and Scenario 2, the bathroom remodel is over budget and provides you with much less return.  Not to mention the disruption and inconvenience you will encounter while the project is underway.

The conclusion is: pick your projects wisely. If you have a limited budget for your home improvements and want to maximize your return on your investment, going big is not always better.

Wednesday, May 21, 2014

Finishing Your Basement


Back in April I wrote about the dangers of finishing your basement - the wrong way. Moisture, or water, was the culprit I said, and you needed to ensure you had bulk water management systems in place before doing anything.  Evaluate before you renovate, was and still is my message.

I also mentioned there were solutions out there and all you had to do was find the right person to ask. Well, since I've written that article I've been asked what the right way to do things is.  That means I'm the go-to guy for this type of information, so here is what you need to do to create a healthy basement.


Insulated Wood Frame Walls Need Two Sides to Dry Out

 

A typical method used to insulate basement walls is to build a wood frame wall, leave a 1 inch air space between the wood studs and the concrete wall, fill the stud bays with fiberglass batt type insulation, and then cover the interior side of the assembly with a sheet of 6 mil polyethylene vapour barrier. With the plastic sheet installed on the warm side of the wall, this limits the wall to only being able to dry out towards the exterior. 
 
Since basement walls are unable to dry out towards the exterior because the ground is damp, and with the tight film of plastic preventing walls from drying out towards the interior, the result is the small amount of water that does make its way into the foundation walls moves into the framed wall and stays there, trapped.

The Better Way to Finish


The better way to finish your basement is to create a wall and/or floor assembly that enables the walls and floor to breath. Using permeable materials allows moisture to travel through them and this helps both the foundation walls and/or floor slab to dry out. The excess water vapour is managed by using a dehumidifier. To construct wall and floor assemblies that help damp concrete to dry out will require you to use vapour-permeable materials like EPS for insulation, latex for paint, and cork for flooring, for example.

All of these finishes allow water to move through them. Although it’s impossible to keep your foundation and floor slab from getting wet because they are in contact with the ground, using a wall and floor assembly that allows the walls and/or floor to dry out is the better solution.

A Final Word Of Warning


A more common water issue impacting homeowners in developed areas in both the US and Canada is urban flooding. Paul Kovacs, executive director at the insurance industry's Institute for Catastrophic Loss Reduction, points out that, according to his research, basement flooding has emerged as one of the fastest growing causes of losses and extreme damage in Canada, costing $2 billion just in direct insurance payments annually. You can read the full study here in Urban Flooding in Canada.
 
The Center For Neighbourhood Technology in the United States has published a case study on the Prevalence and Cost of Urban Flooding in Cook County, IL, and say “the economic and social consequences can be considerable: experts estimate that wet basements decrease property values by 10 - 25 percent.” For a home with an appraised value of $300,000 that’s a monetary loss of $30K to $75K.
 
So before you decide to finish your basement make sure your bulk water management systems in place work, understand the risks associated with flooding, and when making your finish material selections, chose permeable finishes that breath so things dry out when they get moist.
 

Thursday, May 8, 2014

Kitchen Planning and Primary Work Centers

Kitchen Planning - Primary Work Centers



You may find your kitchen is cluttered, there never seems to be enough room to cook or prepare meals, and someone always seems to be in someone's way.  There may be more than one reason your kitchen design may not work for you. Since the kitchen is the "heart" of the home, it's important to get it right.

As a lay person, how do you know if the kitchen you're looking at works or not?  Are there rules good kitchen design needs to follow? Templates even?  I mean, where do you even start?

To help you better understand how your kitchen works, you need to learn about some fundamentals about kitchen design and layout. It all starts with what are called the Primary Work Centers. The importance of Primary Work Centers are they impact the kitchen’s layout, restrict what can or cannot be done in the kitchen, and set the design criteria needed to create an efficient, comfortable, and well planned workspace.


Understanding what the Primary Work Centers are, what they're composed of, and the types of activities that occur enables you to evaluate your current kitchen layout with a more practiced and pragmatic eye. Not only will a good design appeal to you aesthetically, you will know why it makes the heart of your home a very comfortable place to be.

Primary Work Centers


The idea behind Primary Work Centers is based on a rather simple premise.  Group activities in the kitchen into distinct areas and then identify the tools and space needed for these activities. 

That's it in a nutshell really.

Whatever the activities are for each area it only makes sense to ensure there is ample storage, enough counter space, and sufficient lighting for you to be able to carry out the tasks you need to perform.

OK, so what are these "activities"? How granular do you get anyway?  

Let's keep the count down to four activities and they are: cleanup, mixing, cooking, and serving. It also becomes evident that grouping these items might make more sense if you placed the cleanup area next to the mixing, the mixing area near the cooking, and the serving area, well, it can be left to float around a bit or put close to the clean-up area.

Needless to say, identifying these four areas allows you to see there are some relationships between the work centers that are stronger than others.

So, How Does This Help Me?

Circles Keep It Simple
If you look at the diagram provided the arrangement of the work centers fits within the layout of the room and they either create new circulation paths or accommodate existing ones.  

As shown in this example the clean up area is located between the mixing and serving work centers.  The cooking work center is floating up there at the top.  Maybe it's an island, or perhaps it's located on exterior wall? Who knows?  This layout looks like it can accommodate two entrances into the space too.

What we do understand is the work center layout needs to fit the space available, provide the work centers with context to one another, and moving any one center to a new location impacts what is done where and the flow through the space.


The simplicity of designing or evaluating your kitchen using the four work centers allows you to:

  • Learn how activities relate to one another on a macro rather than micro level 
  • Understand how moving one work center to a different location affects the entire layout
  • Quickly create numerous layouts by something as simple as circles
  • Choose a layout that works for you
  • Determine if the layout works for the space available.